Abstract

This study demonstrates through a case study that detailed analyses, even after the construction of a project, are feasible using current technologies and available data. A case study of highway 25 is used to illustrate the method and verify the levels of air contaminants from additionally induced traffic during and after the construction of highway. Natural traffic growth was removed from the effect of observed gas emissions by comparing observed levels on other further locations in the same metropolitan area. This study estimates air pollution from the additional traffic during and after the construction of A-25 extension project. NO2 levels were spatially interpolated during peak and off-peak hour traffic and traffic density simulated on the road network for four scenarios. Comparing the four scenarios, it was found that levels of NO2 concentrations were reduced at neighbor areas due to less traffic during the construction period. Levels of NO2 after the construction were higher than those in 2008. The simulated traffic density for four scenarios revealed that traffic density was significantly increased on both arterial and access roads within the close vicinity of the extension project during and after its construction.

Publisher Statement: This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Original languageEnglish
Article number5161308
Number of pages14
JournalJournal of Advanced Transportation
Volume2017
DOIs
Publication statusPublished - 31 Oct 2017

Fingerprint

Air pollution
Gas emissions
Montreal
Impurities
Air
Scenarios

Cite this

@article{680783c9d4d647dcbbdbb356f37a908e,
title = "Understanding Air Pollution from Induced Traffic during and after the Construction of a New Highway: Case Study of Highway 25 in Montreal",
abstract = "This study demonstrates through a case study that detailed analyses, even after the construction of a project, are feasible using current technologies and available data. A case study of highway 25 is used to illustrate the method and verify the levels of air contaminants from additionally induced traffic during and after the construction of highway. Natural traffic growth was removed from the effect of observed gas emissions by comparing observed levels on other further locations in the same metropolitan area. This study estimates air pollution from the additional traffic during and after the construction of A-25 extension project. NO2 levels were spatially interpolated during peak and off-peak hour traffic and traffic density simulated on the road network for four scenarios. Comparing the four scenarios, it was found that levels of NO2 concentrations were reduced at neighbor areas due to less traffic during the construction period. Levels of NO2 after the construction were higher than those in 2008. The simulated traffic density for four scenarios revealed that traffic density was significantly increased on both arterial and access roads within the close vicinity of the extension project during and after its construction.Publisher Statement: This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.",
author = "Shohel Amin and Umma Tamima and Luis Amador",
year = "2017",
month = "10",
day = "31",
doi = "10.1155/2017/5161308",
language = "English",
volume = "2017",
journal = "Journal of Advanced Transportation",
issn = "0197-6729",
publisher = "Wiley",

}

TY - JOUR

T1 - Understanding Air Pollution from Induced Traffic during and after the Construction of a New Highway

T2 - Case Study of Highway 25 in Montreal

AU - Amin, Shohel

AU - Tamima, Umma

AU - Amador, Luis

PY - 2017/10/31

Y1 - 2017/10/31

N2 - This study demonstrates through a case study that detailed analyses, even after the construction of a project, are feasible using current technologies and available data. A case study of highway 25 is used to illustrate the method and verify the levels of air contaminants from additionally induced traffic during and after the construction of highway. Natural traffic growth was removed from the effect of observed gas emissions by comparing observed levels on other further locations in the same metropolitan area. This study estimates air pollution from the additional traffic during and after the construction of A-25 extension project. NO2 levels were spatially interpolated during peak and off-peak hour traffic and traffic density simulated on the road network for four scenarios. Comparing the four scenarios, it was found that levels of NO2 concentrations were reduced at neighbor areas due to less traffic during the construction period. Levels of NO2 after the construction were higher than those in 2008. The simulated traffic density for four scenarios revealed that traffic density was significantly increased on both arterial and access roads within the close vicinity of the extension project during and after its construction.Publisher Statement: This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

AB - This study demonstrates through a case study that detailed analyses, even after the construction of a project, are feasible using current technologies and available data. A case study of highway 25 is used to illustrate the method and verify the levels of air contaminants from additionally induced traffic during and after the construction of highway. Natural traffic growth was removed from the effect of observed gas emissions by comparing observed levels on other further locations in the same metropolitan area. This study estimates air pollution from the additional traffic during and after the construction of A-25 extension project. NO2 levels were spatially interpolated during peak and off-peak hour traffic and traffic density simulated on the road network for four scenarios. Comparing the four scenarios, it was found that levels of NO2 concentrations were reduced at neighbor areas due to less traffic during the construction period. Levels of NO2 after the construction were higher than those in 2008. The simulated traffic density for four scenarios revealed that traffic density was significantly increased on both arterial and access roads within the close vicinity of the extension project during and after its construction.Publisher Statement: This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

U2 - 10.1155/2017/5161308

DO - 10.1155/2017/5161308

M3 - Article

VL - 2017

JO - Journal of Advanced Transportation

JF - Journal of Advanced Transportation

SN - 0197-6729

M1 - 5161308

ER -