Skip to main navigation Skip to search Skip to main content

The new highway in Peloponnese in Greece and its underground structures. A focus on special conditions

  • Stayroula Schina
  • , Katerina Haralampidou
  • , Thomas Konstantis
  • , Panagiotis Sitarenios

    Research output: Chapter in Book/Report/Conference proceedingConference proceedingpeer-review

    Abstract

    The new highway constructed in south Greece includes many civil engineer constructions, such as tunnels and cut & covers, bridges, embankments, deep excavations, improvement of existing road pavings, widening e.t.c. The paper focuses on the underground structures and especially on the design and the special conditions of “Artemissio” (Left Branch), “Neochori”, “Sterna” and “Kalogeriko” tunnel. The geotechnical conditions where they are excavated, as well as the design approach of temporary support system and final lining are described, while a mention in special geotechnical and other issues for each tunnel and their management is included.
    Original languageEnglish
    Title of host publicationWorld Tunnel Congress 2011, Helsinki, Proceedings in CD.
    Place of PublicationHelsinki, Finland
    Publication statusPublished - May 2011
    EventITA-AITES World Tunnel Congress 2011 - Helsinki, Finland
    Duration: 21 May 201126 May 2011
    Conference number: 37

    Conference

    ConferenceITA-AITES World Tunnel Congress 2011
    Country/TerritoryFinland
    CityHelsinki
    Period21/05/1126/05/11

    Fingerprint

    Dive into the research topics of 'The new highway in Peloponnese in Greece and its underground structures. A focus on special conditions'. Together they form a unique fingerprint.

    Cite this