Abstract
Purpose – The purpose of this study is to provide a model for evaluating, prioritizing and allocating orders to suppliers in the supply chain for mega-projects.
Design/methodology/approach – By using an integrated model (based on fuzzy analytic network process), suppliers are selected and the appropriate amounts are allocated to them in mega-projects. Initially, a hierarchical model of the research method was introduced. Then, the results on reliability and validity analysis
of research measurement tools were presented. Finally, prioritization and allocation of orders to suppliers, with a case study of Iran Mall project, was carried out using Decision Making Trial and Evaluation Laboratory (DEMATEL) and analytic network process (ANP). T-test was used to evaluate the research hypotheses.
Findings – The findings were examined against conventional numerical analysis techniques. Finally, implication and recommendations for future work were presented.
Originality/value – The originality of this work is about using multi-criteria decision-making techniques for evaluating suppliers in mega-projects.
Design/methodology/approach – By using an integrated model (based on fuzzy analytic network process), suppliers are selected and the appropriate amounts are allocated to them in mega-projects. Initially, a hierarchical model of the research method was introduced. Then, the results on reliability and validity analysis
of research measurement tools were presented. Finally, prioritization and allocation of orders to suppliers, with a case study of Iran Mall project, was carried out using Decision Making Trial and Evaluation Laboratory (DEMATEL) and analytic network process (ANP). T-test was used to evaluate the research hypotheses.
Findings – The findings were examined against conventional numerical analysis techniques. Finally, implication and recommendations for future work were presented.
Originality/value – The originality of this work is about using multi-criteria decision-making techniques for evaluating suppliers in mega-projects.
Original language | English |
---|---|
Pages (from-to) | 1157-1181 |
Number of pages | 25 |
Journal | Management Research Review |
Volume | 44 |
Issue number | 8 |
Early online date | 22 Feb 2021 |
DOIs | |
Publication status | Published - 2021 |
Bibliographical note
Copyright © and Moral Rights are retained by the author(s) and/ or other copyright owners. A copy can be downloaded for personal non-commercial research or study, without prior permission or charge. This item cannot be reproduced or quoted extensively from without first obtaining permission in writing from the copyright holder(s). The content must not be changed in any way or sold commercially in any format or medium without the formal permission of the copyright holders.Keywords
- Supplier selection
- FANP
- Supply chain
- Prioritization
- Allocating order supplies
- Allocating order to suppliers
ASJC Scopus subject areas
- Business, Management and Accounting(all)