Abstract
In manufacturing environments, the production planning is at the high level of production and operation management. This paper intends to plan a flow shop manufacturing system producing multi products during multi periods. By planning, the optimal production rate of each product in every period will be determined. In order to specify the optimal production rate, three objectives must be met simultaneously. Planning is done in a stochastic situation and some uncertain parameters are considered for the problem. The simulation-optimisation approach was used and SA algorithm was chosen as the optimiser. Ultimately, after generating 225 new feasible solutions, the optimal production rate was determined. Results showed the trend of searching new solutions reached to a convergence and the average value of objective function decreased from 222,657 to 56,430 and it has been a remarkable reduction. So, the simulation optimisation approach is capable in solving uncertain production planning model even by considering multi objectives simultaneously.
Original language | English |
---|---|
Pages (from-to) | 262 - 280 |
Number of pages | 19 |
Journal | International Journal of Industrial and Systems Engineering |
Volume | 22 |
Issue number | 3 |
Early online date | 16 Feb 2016 |
DOIs | |
Publication status | Published - 2016 |
Externally published | Yes |
Keywords
- production planning
- simulation
- multi-objective optimisation
- simulated annealing
- manufacturing industry
- flow shops
- production rate
- uncertainty