TY - BOOK
T1 - KEYSTONE D1.2:
T2 - Focus groups report including stakeholder requirements and expectations
AU - Garcia-Perez, Alexeis
AU - Jones, Andrew
AU - Broughton, Kevin
AU - Ramiah, Preetha
AU - Metta, Sabino
AU - Re Calegari, Gloria
PY - 2024/7/1
Y1 - 2024/7/1
N2 - This report serves as Deliverable D1.2 for Task 1.2 of the KEYSTONE project. This task, integral to Work Package 1 (Gap Analysis and State of the Art), aims to identify and prioritise the requirements for the KEYSTONE solution, which is essential to enhancing the digitalisation of cross-border EU transport and logistics. The report develops insights gathered through a series of data collection methods including a review of existing secondary data sources (documents, literature), the stakeholder survey findings (D1.1), a focus group, a round table and 13 semi-structured interviews (see Section 2). This report synthesises the stakeholder requirements for KEYSTONE from a range of European socio-economic environments.
AB - This report serves as Deliverable D1.2 for Task 1.2 of the KEYSTONE project. This task, integral to Work Package 1 (Gap Analysis and State of the Art), aims to identify and prioritise the requirements for the KEYSTONE solution, which is essential to enhancing the digitalisation of cross-border EU transport and logistics. The report develops insights gathered through a series of data collection methods including a review of existing secondary data sources (documents, literature), the stakeholder survey findings (D1.1), a focus group, a round table and 13 semi-structured interviews (see Section 2). This report synthesises the stakeholder requirements for KEYSTONE from a range of European socio-economic environments.
UR - https://ec.europa.eu/research/participants/documents/downloadPublic?documentIds=080166e50d309b4a&appId=PPGMS
UR - https://static1.squarespace.com/static/648c2485bcc39e6c2950f8b4/t/668503e047c6e4716f992807/1719993317944/KEYSTONE_WP1_D1.2+-+RequirementsAnalysis.pdf
UR - https://www.keystone-project.com/deliverables
M3 - Commissioned report
BT - KEYSTONE D1.2:
PB - European Union
CY - Belgium
ER -