Abstract
This report serves as Deliverable D1.2 for Task 1.2 of the KEYSTONE project. This task, integral to Work Package 1 (Gap Analysis and State of the Art), aims to identify and prioritise the requirements for the KEYSTONE solution, which is essential to enhancing the digitalisation of cross-border EU transport and logistics. The report develops insights gathered through a series of data collection methods including a review of existing secondary data sources (documents, literature), the stakeholder survey findings (D1.1), a focus group, a round table and 13 semi-structured interviews (see Section 2). This report synthesises the stakeholder requirements for KEYSTONE from a range of European socio-economic environments.
Original language | English |
---|---|
Place of Publication | Belgium |
Publisher | European Union |
Commissioning body | European Horizon 2020 |
Number of pages | 50 |
Publication status | Published - 1 Jul 2024 |
Funding
Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them.
Funders | Funder number |
---|---|
European Horizon 2020 | €3,997,417 total (€474,536 to Coventry University) |