Development of Controller for REPOINT Light Railway Track Switch

Saikat Dutta, Osama Olaby, Tim Harrison, Precious Kaijuka, Maria Sarniento-Carnevali, Samuel D. Bemment, Christopher P. Ward, Roger Dixon

Research output: Chapter in Book/Report/Conference proceedingConference proceedingpeer-review

1 Citation (Scopus)

Abstract

REPOINT Light track switch is a newly devised track switch which is under development. The switch is designed to enhance the reliability of the railway network by implementing closed loop control concept and by introducing actuator redundancy in the switch design. In the present stage of the research, the performance of the designed controller is presented with the experimental data in the laboratory environment. After successful experiments and tests, the full-scale demonstrator of the switch will be deployed to the railway network.

Original languageEnglish
Title of host publication2018 UKACC 12th International Conference on Control, CONTROL 2018
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages126
Number of pages1
ISBN (Electronic)9781538628645
ISBN (Print)9781509064113
DOIs
Publication statusPublished - 1 Nov 2018
Externally publishedYes
EventUKACC 12th International Conference on Control 2018 - Sheffield, United Kingdom
Duration: 5 Sept 20187 Sept 2018
Conference number: 12
https://ieeexplore.ieee.org/xpl/mostRecentIssue.jsp?punumber=8491726

Publication series

Name2018 UKACC 12th International Conference on Control, CONTROL 2018

Conference

ConferenceUKACC 12th International Conference on Control 2018
Abbreviated titleCONTROL 2018
Country/TerritoryUnited Kingdom
CitySheffield
Period5/09/187/09/18
Internet address

Bibliographical note

Funding Information:
ACKNOWLEDGMENT This research is supported by RSSB, UK.

Publisher Copyright:
© 2018 IEEE.

Keywords

  • Actuator redundancy
  • Cascade Control
  • Controller Design
  • REPOINT Light

ASJC Scopus subject areas

  • Control and Systems Engineering
  • Control and Optimization

Fingerprint

Dive into the research topics of 'Development of Controller for REPOINT Light Railway Track Switch'. Together they form a unique fingerprint.

Cite this