Abstract

As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities.

Original languageEnglish
Pages (from-to)330-339
Number of pages10
JournalWaste Management
Volume59
Early online date7 Nov 2016
DOIs
Publication statusPublished - Jan 2017
Externally publishedYes

Fingerprint

management practice
factor analysis
strategic approach
field survey
waste management
logistics
waste minimisation
project
reuse of materials

Bibliographical note

NOTICE: this is the author’s version of a work that was accepted for publication in Waste Management. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Waste Management, [59, (2017)] DOI: 10.1016/j.wasman.2016.10.040

© 2017, Elsevier. Licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International http://creativecommons.org/licenses/by-nc-nd/4.0/

Keywords

  • Conservation of Natural Resources
  • Construction Industry
  • Construction Materials
  • Data Collection
  • Humans
  • Models, Organizational
  • Reproducibility of Results
  • Surveys and Questionnaires
  • Waste Management
  • Journal Article

Cite this

Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., & Owolabi, H. A. (2017). Critical management practices influencing on-site waste minimization in construction projects. Waste Management, 59, 330-339. https://doi.org/10.1016/j.wasman.2016.10.040

Critical management practices influencing on-site waste minimization in construction projects. / Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A.

In: Waste Management, Vol. 59, 01.2017, p. 330-339.

Research output: Contribution to journalArticle

Ajayi, SO, Oyedele, LO, Bilal, M, Akinade, OO, Alaka, HA & Owolabi, HA 2017, 'Critical management practices influencing on-site waste minimization in construction projects' Waste Management, vol. 59, pp. 330-339. https://doi.org/10.1016/j.wasman.2016.10.040
Ajayi, Saheed O ; Oyedele, Lukumon O ; Bilal, Muhammad ; Akinade, Olugbenga O ; Alaka, Hafiz A ; Owolabi, Hakeem A. / Critical management practices influencing on-site waste minimization in construction projects. In: Waste Management. 2017 ; Vol. 59. pp. 330-339.
@article{0f4be3c59b0d4d878a428752a50c0ca8,
title = "Critical management practices influencing on-site waste minimization in construction projects",
abstract = "As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093{\%} of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities.",
keywords = "Conservation of Natural Resources, Construction Industry, Construction Materials, Data Collection, Humans, Models, Organizational, Reproducibility of Results, Surveys and Questionnaires, Waste Management, Journal Article",
author = "Ajayi, {Saheed O} and Oyedele, {Lukumon O} and Muhammad Bilal and Akinade, {Olugbenga O} and Alaka, {Hafiz A} and Owolabi, {Hakeem A}",
note = "NOTICE: this is the author’s version of a work that was accepted for publication in Waste Management. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Waste Management, [59, (2017)] DOI: 10.1016/j.wasman.2016.10.040 {\circledC} 2017, Elsevier. Licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International http://creativecommons.org/licenses/by-nc-nd/4.0/",
year = "2017",
month = "1",
doi = "10.1016/j.wasman.2016.10.040",
language = "English",
volume = "59",
pages = "330--339",
journal = "Waste Management",
issn = "0956-053X",
publisher = "Pergamon Press Ltd.",

}

TY - JOUR

T1 - Critical management practices influencing on-site waste minimization in construction projects

AU - Ajayi, Saheed O

AU - Oyedele, Lukumon O

AU - Bilal, Muhammad

AU - Akinade, Olugbenga O

AU - Alaka, Hafiz A

AU - Owolabi, Hakeem A

N1 - NOTICE: this is the author’s version of a work that was accepted for publication in Waste Management. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Waste Management, [59, (2017)] DOI: 10.1016/j.wasman.2016.10.040 © 2017, Elsevier. Licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International http://creativecommons.org/licenses/by-nc-nd/4.0/

PY - 2017/1

Y1 - 2017/1

N2 - As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities.

AB - As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities.

KW - Conservation of Natural Resources

KW - Construction Industry

KW - Construction Materials

KW - Data Collection

KW - Humans

KW - Models, Organizational

KW - Reproducibility of Results

KW - Surveys and Questionnaires

KW - Waste Management

KW - Journal Article

U2 - 10.1016/j.wasman.2016.10.040

DO - 10.1016/j.wasman.2016.10.040

M3 - Article

VL - 59

SP - 330

EP - 339

JO - Waste Management

JF - Waste Management

SN - 0956-053X

ER -