A BIM-driven framework for integrating rules and regulations in the decommissioning of nuclear power plants

Henry Akponanabofa Oti, Peter Farrell, Henry Fonbeyin Abanda, Paul McMahon, Abdul-Majeed Mahamadu, Dingayo Mzyece, Adeyemi Ayodele Akintola, Nawal Prinja

Research output: Contribution to journalArticlepeer-review

4 Citations (Scopus)
285 Downloads (Pure)

Abstract

Purpose: The relatively low capital cost and contributions to mitigating global warming have favoured the continuous construction and operation of nuclear power plants (NPPs) across the world. One critical phase in the operation of nuclear plants for ensuring the safety and security of radioactive products and by-products is decommissioning. With the advent of digital twinning in the building information modelling (BIM) methodology, efficiency and safety can be improved from context-focus access to regulations pertaining to demolition of structures and the cleaning-up of radioactivity inherent in nuclear stations. The purpose of this study, therefore, is to propose a BIM-driven framework to achieve a more regulation-aware and safer decommissioning of nuclear power plants. Design/methodology/approach: The framework considers task requirements, and landscape and environmental factors in modelling demolition scenarios that characterise decommissioning processes. The framework integrates decommissioning rules/regulations in a BIM linked non-structured query system to model items and decommissioning tasks, which are implemented based on context-focussed retrieval of decommissioning rules and regulations. The concept’s efficacy is demonstrated using example cases of digitalised NPPs. Findings: This approach contributes to enhancing improvements in nuclear plant decommissioning with potential for appropriate activity sequencing, risk reduction and ensuring safety. Originality/value: A BIM-driven framework hinged on querying non-structured databases to provide context-focussed access to nuclear rules and regulations and to aiding decommissioning is new.

Original languageEnglish
Pages (from-to)809-830
Number of pages22
JournalConstruction Innovation
Volume22
Issue number4
Early online date22 Jul 2021
DOIs
Publication statusPublished - 28 Nov 2022

Keywords

  • BIM
  • Context-focussed
  • Decommissioning
  • Nuclear power plants
  • Regulations
  • Tasks

ASJC Scopus subject areas

  • Control and Systems Engineering
  • General Computer Science
  • Civil and Structural Engineering
  • Architecture
  • Building and Construction

Fingerprint

Dive into the research topics of 'A BIM-driven framework for integrating rules and regulations in the decommissioning of nuclear power plants'. Together they form a unique fingerprint.

Cite this